Pier B On-Dock Rail Support Facility Project
Shoemaker Bridge Ramp Demolition Open House
Learn more about upcoming construction on the Shoemaker Bridge that connects the Long Beach (710) Freeway to downtown Long Beach. The 9th and 10th Street ramps from the bridge will be demolished as part of the Pier B project, necessitating several weekend closures of the bridge in Summer 2026. Join us to learn more.
Tuesday, December 2 | 8:30 to 10:30 a.m.
Port of Long Beach
1st Floor Maintenance Facility
725 Harbor Plaza, Long Beach 90802
Free parking onsite